ANAO Defence Major Projects Report (Australia): projects
AIR 5349 Ph 1 and 2
2012-13
Additional Kc-30A Multi-Role Tanker Transport
2018-19
Additional Medium Lift Helicopters
2016-17
Advanced Growler – Airborne Electronic Attack Upgrade
2024-25
Ah-64E Apache Attack Helicopter
2024-25
Air To Air Refuelling Capability
2015-16
Air Warfare Destroyer
2019-20
Airborne Early Warning And Control Aircraft
2014-15
Airborne Intelligence, Surveillance, Reconnaissance And Electronic Warfare (Isrew) Capability
2023-24
Amphibious Ships (Lhd)
2018-19
Amphibious Watercraft Replacement
2018-19
Anzac Air Search Radar Replacement
2024-25
Anzac Anti-Ship Missile Defence
2017-18
Anzac Anti-Ship Missile Defence
2018-19
Armed Reconnaissance Helicopter
2016-17
Armed Reconnaissance Helicopter (Arh) Replacement
2023-24
Armidales Armidale Class Patrol Boat
2012-13
Armoured Combat
2024-25
Battlefield Command Support System
2014-15
Battlefield Command System
2024-25
Battlefield Command Systems
2017-18
Battlespace Communications System
2018-19
Battlespace Communications Systems
2023-24
Battlespace Communications Systems
2022-23
Bridging Air Combat Capability
2009-10
Bushmaster Protected Mobility Vehicle
2016-17
C-17 Heavy Airlift C‐17 Globemaster Iii Heavy Airlifter
2011-12
Civil Military Air Traffic Management System (Cmats)
2024-25
Collins Class Communications And Electronic Warfare Improvement Program
2024-25
Collins Class Submarine Reliability And Sustainability
2019-20
Collins Replacement Combat System
2017-18
Ea-18G Growler Airborne Electronic Attack Capability
2019-20
F/A–18 Hornet Upgrade
2007-08
Future Naval Aviation Combat System
2019-20
Future Submarines Design Acquisition
2021-22
Guided Missile Frigate Upgrade Implementation
2013-14
Helicopter Aircrew Training System
2015-16
Helicopter Aircrew Training System
2018-19
High Frequency Modernisation
2013-14
High Frequency Modernisation Project
2007-08
Hornet Refurb F/A‐18 Hornet Upgrade Structural Refurbishment
2010-11
Hornet Upgrade F/A‐18 Hornet Upgrade
2013-14
Hunter Class Frigate Design And Construction
2024-25
Improved Embarked Logistics Support Helicopter
2024-25
Indian Ocean Region Uhf Satcom Starts
2020-21
Integrated Air And Missile Defence Command And Control
2024-25
Jindalee Operational Radar Network (Jorn) Mid- Life Upgrade
2024-25
LAND 121 Phase 3
2011-12
LAND 17 Phase 1A
2013-14
LAND 19 Phase 7A
2012-13
Light Tactical Fixed Wing
2021-22
Long Range Fires
2024-25
Main Battle Tank Upgrade/ Combat Engineering Vehicle Acquisition
2023-24
Maritime Communications Modernisation
2024-25
Maritime Operational Support Capability (Replacement Replenishment Ships)
2021-22
Maritime Patrol And Response Aircraft System
2019-20
Mc-55A Peregrine
2024-25
Medium Heavy Capability, Field Vehicles, Modules And Trailers
2023-24
Mounted Combat Reconnaissance Capability
2024-25
Mq-4C Triton
2024-25
Mq-4C Triton Remotely Piloted Aircraft System
2023-24
Multi-Role Helicopter
2022-23
New Air Combat Capability
2024-25
Next Gen Satellite Next Generation Satcom Capability
2013-14
Night Fighting Equipment Replacement
2019-20
Offshore Patrol Vessel
2024-25
Overlander Medium/Heavy Capability, Field Vehicles Modules And Trailers (Phase 2A)
2009-10
Overlander Vehicles
2016-17
Pacific Patrol Boat Replacement
2024-25
Protected Mobility Vehicles Light
2024-25
Replacement Heavyweight Torpedo
2017-18
SEA 1390 Phase 4B
2013-14
Short Range Ground Based Air Defence
2024-25
Stand Off Weapon Follow‐On Stand Off Weapon
2013-14