# Tollgate Data — every published fact > Government project-performance panels rebuilt from the public registers: Australian federal and state, and the UK. Derived data is CC BY 4.0, attributed to the dataset page. Each source keeps its own licence, listed below. ## DTA Major Digital Projects Report (Australia) https://data.tollgatehq.com/datasets/mdpr · Digital Transformation Agency · CC BY 3.0 AU · as at 27 May 2026 · 260 rows · 2 releases (2025: 136, 2026: 124) · 87 projects in both DTA Major Digital Projects Report (Australia): 28% of 75 projects now cost more than their baseline figure, as at 27 May 2026. Cite: Digital Transformation Agency (2026). DTA Major Digital Projects Report (Australia). Tollgate Data, https://data.tollgatehq.com/datasets/mdpr, as at 27 May 2026. Licence: CC BY 3.0 AU. ### Charts - 45 of 87 continuing projects changed budget — The 12 largest movements are drawn (8 increases, 4 decreases) of the 24 projects that moved by more than $5m. The net movement is +$388m across the 84 continuing projects with a budget in both releases. A budget movement between MDPR releases can be a government decision (a new tranche, re-scoping, a transfer) as much as cost pressure. The DTA restates budgets when scope changes, so a movement here is not automatically an overrun. Rows: https://data.tollgatehq.com/datasets/mdpr?chart=budget-moves (See the 90 rows) - Confidence moved on 35 of 57 rated projects: 20 projects improved, 15 worsened — The Delivery Confidence Assessment is the DTA's own read on whether a project will land on time, on budget and to expectations. Both years come from the later MDPR release, over the projects rated in both the 2025 and 2026 columns. Rows: https://data.tollgatehq.com/datasets/mdpr?chart=dca-slope (See the 57 rows) - 37 of 85 continuing projects now report a later end date — The median push is 6 months among the 37 projects that now finish later. A later end date is not always slippage: some projects gain funded extensions or new tranches. Either way the movement is published, dated and visible. Rows: https://data.tollgatehq.com/datasets/mdpr?chart=end-shift (See the 170 rows) - 28% of 75 projects now cost more than their baseline figure — DTA Major Digital Projects Report (Australia): the cost at the project's first snapshot against the cost at its latest; nominal, no CPI adjustment. 75 of 173 projects can be compared. The median is +17% among the 21 projects that moved above plan, and 0% across all 75 projects that can be compared. Above plan includes deliberate re-scoping, so this is not a count of blowouts. Protocol 1.0. Rows: https://data.tollgatehq.com/datasets/mdpr?chart=std-cost-growth-distribution (See the 150 rows) - The source reports 39% of 76 projects finishing late — DTA Major Digital Projects Report (Australia): calendar months between the completion date at the project's first snapshot and the date at its latest. 76 of 173 projects can be compared. The median is 5 months among the 30 projects that slipped, and -1 months across all 76 projects that can be compared. Protocol 1.0. Rows: https://data.tollgatehq.com/datasets/mdpr?chart=std-schedule-slip-distribution (See the 152 rows) - Cost sits above baseline for 22% to 50% of projects across 3 tier groups — DTA Major Digital Projects Report (Australia): the share of projects above baseline cost, split by tier. A group with fewer than 10 projects that can be compared is left out. All 3 groups that made the cut get their own bar. Each bar carries a Wilson 95% interval. Protocol 1.0; association, not cause. Rows: https://data.tollgatehq.com/datasets/mdpr?chart=std-drivers-tier (See the 150 rows) - Cost sits above baseline for 15% to 32% of projects across 2 delivery status groups — DTA Major Digital Projects Report (Australia): the share of projects above baseline cost, split by delivery status. A group with fewer than 10 projects that can be compared is left out. All 2 groups that made the cut get their own bar. Each bar carries a Wilson 95% interval. Protocol 1.0; association, not cause. Rows: https://data.tollgatehq.com/datasets/mdpr?chart=std-drivers-delivery-status (See the 144 rows) - 44% of the 59 projects rated in 2026 were Medium or lower on delivery confidence — DTA Major Digital Projects Report (Australia): status as the source published it at each snapshot. Levels in use at 2026: Medium-Low, Medium, Medium-High, High. 56 unrated or exempt rows sit outside the 2026 bar. These are the source's own words, carried through without re-grading. Protocol 1.0. Rows: https://data.tollgatehq.com/datasets/mdpr?chart=std-status-mix (See the 260 rows) - Cost sits above baseline for 5.3% to 42% of projects across the four size bands — DTA Major Digital Projects Report (Australia): share of projects above baseline cost, by quartile of project size. Size is the source's own budget figure at the project's latest snapshot. The four quartiles hold 18, 19, 19 and 19 projects. Each bar carries a Wilson 95% interval. Protocol 1.0; association, not cause. Rows: https://data.tollgatehq.com/datasets/mdpr?chart=std-drivers-size-band (See the 150 rows) - Tier 3 covers 50% of the 10 projects that planned to start in 2025 — DTA Major Digital Projects Report (Australia): the tier mix of every project with a planned start date, by the year it planned to start. Each bar is a share of the cohort's projects that report a tier, 10 to 45 projects per cohort. A cohort under 10 projects does not appear, and levels outside the five most common sit in Other. Protocol 1.0. Rows: https://data.tollgatehq.com/datasets/mdpr?chart=std-attribute-mix-by-cohort (See the 260 rows) - 39% of the 127 projects seen before 2026 are absent from it — DTA Major Digital Projects Report (Australia): each bar holds the projects continuing from the previous snapshot and those entering at this one, so it is that snapshot's own population. Leavers are not a band on it. 49 projects left between 2025 and 2026. A leaver is not a failure: a project that finished leaves the register the same way one that stopped does, and this measure cannot tell them apart. The source publishes no completion or termination marker, so every exit here is unexplained. Protocol 1.0. Rows: https://data.tollgatehq.com/datasets/mdpr?chart=std-churn (See the 260 rows) ### Releases - 2025 (https://data.tollgatehq.com/datasets/mdpr/2025): The 2025 release reports 136 projects. Reported budgets total $15.0b across the 133 projects that state one. - 2026 (https://data.tollgatehq.com/datasets/mdpr/2026): The 2026 release reports 124 projects. Among the 115 projects we can track across releases, 37 projects are new since 2025 and 49 projects reported in 2025 no longer appear. 44% of the 59 projects rated in 2026 were Medium or lower on delivery confidence. 28% of the 75 projects reported in both 2025 and 2026 carry a higher cost figure in 2026. Among the 21 projects that rose, the median rise is 17%. Reported budgets total $10.0b across the 110 projects that state one. ### Questions - Q: What share of DTA MDPR projects cost more than their baseline? A: 28% of 75 projects now cost more than their baseline figure. DTA Major Digital Projects Report (Australia): the cost at the project's first snapshot against the cost at its latest; nominal, no CPI adjustment. - Q: What share of DTA MDPR projects finish later than planned? A: The source reports 39% of 76 projects finishing late. DTA Major Digital Projects Report (Australia): calendar months between the completion date at the project's first snapshot and the date at its latest. - Q: How many DTA MDPR projects are rated Medium or lower? A: 44% of the 59 projects rated in 2026 were Medium or lower on delivery confidence. DTA Major Digital Projects Report (Australia): status as the source published it at each snapshot. - Q: Do bigger DTA MDPR projects overrun more often? A: Cost sits above baseline for 5.3% to 42% of projects across the four size bands. DTA Major Digital Projects Report (Australia): share of projects above baseline cost, by quartile of project size. Association, not cause. - Q: How many DTA MDPR projects enter and leave each snapshot? A: 39% of the 127 projects seen before 2026 are absent from it. DTA Major Digital Projects Report (Australia): each bar holds the projects continuing from the previous snapshot and those entering at this one, so it is that snapshot's own population. ## ANAO Defence Major Projects Report (Australia) https://data.tollgatehq.com/datasets/anao-mpr · Australian National Audit Office · CC BY-NC-ND 3.0 AU · as at 30 Jun 2025 · 421 rows · 18 editions (2007-08 → 2024-25) · 74 projects ANAO Defence Major Projects Report (Australia): 86% of 49 projects now cost more than their baseline figure, as at 30 Jun 2025. Cite: Australian National Audit Office (2025). ANAO Defence Major Projects Report (Australia). Tollgate Data, https://data.tollgatehq.com/datasets/anao-mpr, as at 30 Jun 2025. Licence: CC BY-NC-ND 3.0 AU. ### Charts - Approved budgets sit 26% above entry across 74 projects: $139.8b then, $175.5b now — Each dot is one project: its budget on entry to the MPR against its latest approved budget. This is growth. It carries deliberate re-scoping decisions (JSF Stage 2 added 58 aircraft; Hunter was re-baselined to the full program), price indexation and foreign exchange, so it does not measure overrun. The gates do not stop budgets moving; they make every movement visible and explained. Rebuilt from extracted facts; not a reproduction of ANAO's charts. Rows: https://data.tollgatehq.com/datasets/anao-mpr?chart=budget-growth (See the 421 rows) - 18 projects tracked 9+ editions: median budget now 103% of the first report — Approved budget per project, indexed to 100 at its first MPR appearance, over the projects tracked nine or more editions. Every step is a dated gate decision, scope added or removed. A line above the entry value (100) is not by itself an overrun. Rebuilt from extracted facts; not a reproduction of ANAO's charts. Rows: https://data.tollgatehq.com/datasets/anao-mpr?chart=budget-trajectories (See the 192 rows) - 86% of 49 projects now cost more than their baseline figure — ANAO Defence Major Projects Report (Australia): the source's own growth figure, nominal, with indexation and FX included wherever the source includes them. 49 of 74 projects can be compared. The median is +12% among the 42 projects that moved above plan, and +7% across all 49 projects that can be compared. Above plan includes deliberate re-scoping, so this is not a count of blowouts. Protocol 1.0. Rows: https://data.tollgatehq.com/datasets/anao-mpr?chart=std-cost-growth-distribution (See the 304 rows) - Cost sits above baseline for 85% to 93% of projects across 2 complexity groups — ANAO Defence Major Projects Report (Australia): the share of projects above baseline cost, split by complexity. A group with fewer than 10 projects that can be compared is left out. All 2 groups that made the cut get their own bar. Each bar carries a Wilson 95% interval. Protocol 1.0; association, not cause. Rows: https://data.tollgatehq.com/datasets/anao-mpr?chart=std-drivers-complexity (See the 252 rows) - Cost sits above baseline for 70% to 100% of projects across 3 capability type groups — ANAO Defence Major Projects Report (Australia): the share of projects above baseline cost, split by capability type. A group with fewer than 10 projects that can be compared is left out. All 3 groups that made the cut get their own bar. Each bar carries a Wilson 95% interval. Protocol 1.0; association, not cause. Rows: https://data.tollgatehq.com/datasets/anao-mpr?chart=std-drivers-capability-type (See the 298 rows) - Cost sits above baseline for 58% to 100% of projects across the four size bands — ANAO Defence Major Projects Report (Australia): share of projects above baseline cost, by quartile of project size. Size is the source's own total approved budget figure at the project's latest snapshot. The four quartiles hold 12, 12, 12 and 13 projects. Each bar carries a Wilson 95% interval. Protocol 1.0; association, not cause. Rows: https://data.tollgatehq.com/datasets/anao-mpr?chart=std-drivers-size-band (See the 304 rows) - The 5 largest projects carry 70% of planned cost across 21 projects — ANAO Defence Major Projects Report (Australia): $81.5b of planned cost across the 21 projects in the latest snapshot (2024-25) that carry a size figure. Size is the source's own total approved budget figure at the project's latest snapshot, nominal, no CPI adjustment. No project is named here. Protocol 1.0. Rows: https://data.tollgatehq.com/datasets/anao-mpr?chart=std-size-distribution (See the 21 rows) - 78% of the 68 projects seen before 2024-25 are absent from it — ANAO Defence Major Projects Report (Australia): each bar holds the projects continuing from the previous snapshot and those entering at this one, so it is that snapshot's own population. Leavers are not a band on it. 6 projects left between 2023-24 and 2024-25. A leaver is not a failure: a project that finished leaves the register the same way one that stopped does, and this measure cannot tell them apart. Protocol 1.0. Rows: https://data.tollgatehq.com/datasets/anao-mpr?chart=std-churn (See the 421 rows) ### Releases - 2007-08 (https://data.tollgatehq.com/datasets/anao-mpr/2007-08): The 2007-08 release reports 9 projects. Reported budgets total $13.5b across the 9 projects that state one. - 2008-09 (https://data.tollgatehq.com/datasets/anao-mpr/2008-09): The 2008-09 release reports 15 projects. 8 projects are new since 2007-08 and 2 projects reported in 2007-08 no longer appear. Reported budgets total $37.8b across the 15 projects that state one. - 2009-10 (https://data.tollgatehq.com/datasets/anao-mpr/2009-10): The 2009-10 release reports 22 projects. 7 projects are new since 2008-09 and 0 projects reported in 2008-09 no longer appear. Reported budgets total $40.8b across the 22 projects that state one. - 2010-11 (https://data.tollgatehq.com/datasets/anao-mpr/2010-11): The 2010-11 release reports 28 projects. 8 projects are new since 2009-10 and 2 projects reported in 2009-10 no longer appear. Reported budgets total $46.1b across the 28 projects that state one. - 2011-12 (https://data.tollgatehq.com/datasets/anao-mpr/2011-12): The 2011-12 release reports 29 projects. 2 projects are new since 2010-11 and 1 project reported in 2010-11 no longer appears. Reported budgets total $47.3b across the 29 projects that state one. - 2012-13 (https://data.tollgatehq.com/datasets/anao-mpr/2012-13): The 2012-13 release reports 29 projects. 2 projects are new since 2011-12 and 2 projects reported in 2011-12 no longer appear. Reported budgets total $44.3b across the 29 projects that state one. - 2013-14 (https://data.tollgatehq.com/datasets/anao-mpr/2013-14): The 2013-14 release reports 30 projects. 4 projects are new since 2012-13 and 3 projects reported in 2012-13 no longer appear. Reported budgets total $59.4b across the 30 projects that state one. - 2014-15 (https://data.tollgatehq.com/datasets/anao-mpr/2014-15): The 2014-15 release reports 25 projects. 2 projects are new since 2013-14 and 7 projects reported in 2013-14 no longer appear. Reported budgets total $60.5b across the 25 projects that state one. - 2015-16 (https://data.tollgatehq.com/datasets/anao-mpr/2015-16): The 2015-16 release reports 26 projects. 3 projects are new since 2014-15 and 2 projects reported in 2014-15 no longer appear. Reported budgets total $62.7b across the 26 projects that state one. - 2016-17 (https://data.tollgatehq.com/datasets/anao-mpr/2016-17): The 2016-17 release reports 27 projects. 3 projects are new since 2015-16 and 2 projects reported in 2015-16 no longer appear. Reported budgets total $62.0b across the 27 projects that state one. - 2017-18 (https://data.tollgatehq.com/datasets/anao-mpr/2017-18): The 2017-18 release reports 26 projects. 3 projects are new since 2016-17 and 4 projects reported in 2016-17 no longer appear. 81% of the 26 projects with a stated growth figure cost more than their original approval. Among the 21 projects that grew, the median growth is 15%. Reported budgets total $59.4b across the 26 projects that state one. - 2018-19 (https://data.tollgatehq.com/datasets/anao-mpr/2018-19): The 2018-19 release reports 26 projects. 4 projects are new since 2017-18 and 4 projects reported in 2017-18 no longer appear. 85% of the 26 projects with a stated growth figure cost more than their original approval. Among the 22 projects that grew, the median growth is 6.8%. Reported budgets total $64.1b across the 26 projects that state one. - 2019-20 (https://data.tollgatehq.com/datasets/anao-mpr/2019-20): The 2019-20 release reports 25 projects. 5 projects are new since 2018-19 and 6 projects reported in 2018-19 no longer appear. 80% of the 25 projects with a stated growth figure cost more than their original approval. Among the 20 projects that grew, the median growth is 6.7%. Reported budgets total $78.7b across the 25 projects that state one. - 2020-21 (https://data.tollgatehq.com/datasets/anao-mpr/2020-21): The 2020-21 release reports 21 projects. 2 projects are new since 2019-20 and 6 projects reported in 2019-20 no longer appear. 70% of the 20 projects with a stated growth figure cost more than their original approval. Among the 14 projects that grew, the median growth is 3.5%. Reported budgets total $58.0b across the 21 projects that state one. - 2021-22 (https://data.tollgatehq.com/datasets/anao-mpr/2021-22): The 2021-22 release reports 21 projects. 1 project is new since 2020-21 and 1 project reported in 2020-21 no longer appears. 75% of the 20 projects with a stated growth figure cost more than their original approval. Among the 15 projects that grew, the median growth is 3.5%. Reported budgets total $59.0b across the 21 projects that state one. - 2022-23 (https://data.tollgatehq.com/datasets/anao-mpr/2022-23): The 2022-23 release reports 20 projects. 3 projects are new since 2021-22 and 4 projects reported in 2021-22 no longer appear. 75% of the 20 projects with a stated growth figure cost more than their original approval. Among the 15 projects that grew, the median growth is 9.0%. Reported budgets total $58.6b across the 20 projects that state one. - 2023-24 (https://data.tollgatehq.com/datasets/anao-mpr/2023-24): The 2023-24 release reports 21 projects. 3 projects are new since 2022-23 and 2 projects reported in 2022-23 no longer appear. 95% of the 21 projects with a stated growth figure cost more than their original approval. Among the 20 projects that grew, the median growth is 7.5%. Reported budgets total $81.0b across the 21 projects that state one. - 2024-25 (https://data.tollgatehq.com/datasets/anao-mpr/2024-25): The 2024-25 release reports 21 projects. 6 projects are new since 2023-24 and 6 projects reported in 2023-24 no longer appear. 95% of the 21 projects with a stated growth figure cost more than their original approval. Among the 20 projects that grew, the median growth is 7.7%. Reported budgets total $81.5b across the 21 projects that state one. ### Questions - Q: What share of ANAO Defence MPR projects cost more than their baseline? A: 86% of 49 projects now cost more than their baseline figure. ANAO Defence Major Projects Report (Australia): the source's own growth figure, nominal, with indexation and FX included wherever the source includes them. - Q: Do bigger ANAO Defence MPR projects overrun more often? A: Cost sits above baseline for 58% to 100% of projects across the four size bands. ANAO Defence Major Projects Report (Australia): share of projects above baseline cost, by quartile of project size. Association, not cause. - Q: How many ANAO Defence MPR projects enter and leave each snapshot? A: 78% of the 68 projects seen before 2024-25 are absent from it. ANAO Defence Major Projects Report (Australia): each bar holds the projects continuing from the previous snapshot and those entering at this one, so it is that snapshot's own population. ## ANAO MPR schedule milestones (Australia) https://data.tollgatehq.com/datasets/anao-mpr-schedule · Australian National Audit Office · CC BY-NC-ND 3.0 AU · as at 30 Jun 2025 · 1,285 milestone rows (29 known duplicates) · 10 editions (2014-15, 2016-17 → 2024-25) · IMR/IOC/FMR/FOC variance in months ANAO MPR schedule milestones (Australia): The source reports 72% of 39 projects finishing late, as at 30 Jun 2025. Cite: Australian National Audit Office (2025). ANAO MPR schedule milestones (Australia). Tollgate Data, https://data.tollgatehq.com/datasets/anao-mpr-schedule, as at 30 Jun 2025. Licence: CC BY-NC-ND 3.0 AU. ### Charts - 28 of the 39 projects reporting FOC variance slipped — The latest Final Operational Capability variance per project, in months against the original gate commitment, from the PDSS schedule tables of the 2014-15 to 2024-25 editions. The median is 30 months across all 39 projects reporting a variance. Each bar counts projects: the heights say how many slipped, the median says how far. Rebuilt from extracted facts; not a reproduction of ANAO's charts. Rows: https://data.tollgatehq.com/datasets/anao-mpr-schedule?chart=foc-slippage (See the 1032 rows) - The source reports 72% of 39 projects finishing late — ANAO MPR schedule milestones (Australia): the source's own variance in months, from the most recent edition that reports it. 39 of 52 projects can be compared. The median is 40.5 months among the 28 projects that slipped, and 30 months across all 39 projects that can be compared. Protocol 1.0. Rows: https://data.tollgatehq.com/datasets/anao-mpr-schedule?chart=std-schedule-slip-distribution (See the 1,032 rows) - 72% of the 46 projects seen before 2024-25 are absent from it — ANAO MPR schedule milestones (Australia): each bar holds the projects continuing from the previous snapshot and those entering at this one, so it is that snapshot's own population. Leavers are not a band on it. 6 projects left between 2023-24 and 2024-25. A leaver is not a failure: a project that finished leaves the register the same way one that stopped does, and this measure cannot tell them apart. Protocol 1.0. Rows: https://data.tollgatehq.com/datasets/anao-mpr-schedule?chart=std-churn (See the 1,285 rows) ### Questions - Q: What share of ANAO MPR schedule projects finish later than planned? A: The source reports 72% of 39 projects finishing late. ANAO MPR schedule milestones (Australia): the source's own variance in months, from the most recent edition that reports it. - Q: How many ANAO MPR schedule projects enter and leave each snapshot? A: 72% of the 46 projects seen before 2024-25 are absent from it. ANAO MPR schedule milestones (Australia): each bar holds the projects continuing from the previous snapshot and those entering at this one, so it is that snapshot's own population. ## Victorian IT Project Dashboard https://data.tollgatehq.com/datasets/vic-itd · Victorian Government (DGS) · CC BY 4.0 · as at 18 May 2026 · 10,938 rows · 40 quarters (2015-16 Q3 → 2025-26 Q2) · 2,092 projects Victorian IT Project Dashboard: 67% of 966 projects now cost more than their baseline figure, as at 18 May 2026. Cite: Victorian Government (DGS) (2026). Victorian IT Project Dashboard. Tollgate Data, https://data.tollgatehq.com/datasets/vic-itd, as at 18 May 2026. Licence: CC BY 4.0. ### Charts - 67% of 966 projects now cost more than their baseline figure — Victorian IT Project Dashboard: baseline and current cost taken from the same row, the project's latest snapshot; nominal, no CPI adjustment. 966 of 2092 projects can be compared. The median is +26% among the 649 projects that moved above plan, and +9% across all 966 projects that can be compared. 80 projects report a zero baseline and are left out: you cannot compute growth against zero. Above plan includes deliberate re-scoping, so this is not a count of blowouts. This compares against the planned figure on the latest row; the restatement chart below compares against the original plan. Protocol 1.0. Rows: https://data.tollgatehq.com/datasets/vic-itd?chart=std-cost-growth-distribution (See the 6,218 rows) - 68% of 906 projects cost more than the original plan, 68% more than the current one — Victorian IT Project Dashboard: the 906 projects seen in at least two snapshots that carry a planned cost. Above the original plan compares the latest current cost against the first planned figure the source published; above the current plan compares it against the planned figure on the latest row. Restating the plan moves the share by 0.1 points: here the restated plan and the original give the same answer. A source that publishes no separate baseline is left out here: comparing its first report to its latest already uses the original figure. Each bar carries a Wilson 95% interval. Protocol 1.0. Rows: https://data.tollgatehq.com/datasets/vic-itd?chart=std-restatement-drift (See the 6,158 rows) - The source reports 87% of 1161 projects finishing late — Victorian IT Project Dashboard: calendar months between the baseline and the current completion date, both on the latest row. 1161 of 2092 projects can be compared. The median is 8 months among the 1013 projects that slipped, and 6 months across all 1161 projects that can be compared. Protocol 1.0. Rows: https://data.tollgatehq.com/datasets/vic-itd?chart=std-schedule-slip-distribution (See the 7,544 rows) - Cost sits above baseline for 51% to 83% of projects across 9 methodology groups — Victorian IT Project Dashboard: the share of projects above baseline cost, split by methodology. A group with fewer than 10 projects that can be compared is left out. 8 of the 9 groups that made the cut get their own bar: the biggest by project count, plus the highest and the lowest. Each bar carries a Wilson 95% interval. Protocol 1.0; association, not cause. Rows: https://data.tollgatehq.com/datasets/vic-itd?chart=std-drivers-methodology (See the 5,525 rows) - Cost sits above baseline for 36% to 77% of projects across 12 domain groups — Victorian IT Project Dashboard: the share of projects above baseline cost, split by domain. A group with fewer than 10 projects that can be compared is left out. 8 of the 12 groups that made the cut get their own bar: the biggest by project count, plus the highest and the lowest. Each bar carries a Wilson 95% interval. Protocol 1.0; association, not cause. Rows: https://data.tollgatehq.com/datasets/vic-itd?chart=std-drivers-domain (See the 5,518 rows) - Cost sits above baseline for 58% to 93% of projects across 13 category groups — Victorian IT Project Dashboard: the share of projects above baseline cost, split by category. A group with fewer than 10 projects that can be compared is left out. 8 of the 13 groups that made the cut get their own bar: the biggest by project count, plus the highest and the lowest. Each bar carries a Wilson 95% interval. Protocol 1.0; association, not cause. Rows: https://data.tollgatehq.com/datasets/vic-itd?chart=std-drivers-category (See the 2,501 rows) - Cost sits above baseline for 5.6% to 100% of projects across 28 agency short groups — Victorian IT Project Dashboard: the share of projects above baseline cost, split by agency short. A group with fewer than 10 projects that can be compared is left out. 8 of the 28 groups that made the cut get their own bar: the biggest by project count, plus the highest and the lowest. Each bar carries a Wilson 95% interval. Protocol 1.0; association, not cause. Rows: https://data.tollgatehq.com/datasets/vic-itd?chart=std-drivers-agency-short (See the 1,965 rows) - Cost sits above baseline for 63% to 80% of projects, by delivery confidence at first report — Victorian IT Project Dashboard: share of projects above baseline cost, by the status published at the project's first snapshot, worst to best. Taken over the 667 projects in the qualifying confidence levels (seen at least twice, with a comparable cost); levels with fewer than 10 such projects do not qualify. Each bar carries a Wilson 95% interval. Protocol 1.0; association, not cause. Rows: https://data.tollgatehq.com/datasets/vic-itd?chart=std-drivers-first-confidence (See the 3,918 rows) - 11% of 555 completed projects came in at or under plan on both cost and date — Victorian IT Project Dashboard: the projects the source marks completed that carry a baseline and a current figure for both cost and completion date. This compares against the plan as the latest row states it; against the first stated plan the share is 10.4% of 557 completed projects. Wilson 95% interval shown. Protocol 1.0. Rows: https://data.tollgatehq.com/datasets/vic-itd?chart=std-delivered-on-plan (See the 3,658 rows) - 0.0% to 9.1% of completed projects kept the original plan on cost and date, by start year — Victorian IT Project Dashboard: a project counts as kept only where the source marks it completed and it came in at or under the first planned cost and completion date the source stated. Cohorts are the year the project planned to start; the 11 cohorts that made the cut hold, oldest first, 11, 12, 33, 68, 65, 40, 45, 55, 47, 48 and 17 completed projects, and a cohort under 10 completed projects does not appear. 115 completed projects state no planned start and sit in no cohort. Across all 557 completed projects carrying an original commitment, 10.4% came in at or under it. Each bar carries a Wilson 95% interval. Protocol 1.0. Rows: https://data.tollgatehq.com/datasets/vic-itd?chart=std-promise-kept-by-cohort (See the 3,183 rows) - 9.8% of the 244 projects rated in 2025-26 Q2 were Red — Victorian IT Project Dashboard: status as the source published it at each snapshot. Levels in use at 2025-26 Q2: Red, Amber, Green. 40 unrated or exempt rows sit outside the 2025-26 Q2 bar. These are the source's own words, carried through without re-grading. Protocol 1.0. Rows: https://data.tollgatehq.com/datasets/vic-itd?chart=std-status-mix (See the 10,938 rows) - Confidence moved on 48 of 227 rated projects between 2025-26 Q1 and 2025-26 Q2: 28 projects improved, 20 worsened — Victorian IT Project Dashboard: the 227 projects carrying a rated status in both 2025-26 Q1 and 2025-26 Q2. A project rated in only one of the two is not counted. Movement is read on the source's own scale, worst to best. Protocol 1.0. Rows: https://data.tollgatehq.com/datasets/vic-itd?chart=std-status-transitions (See the 1,627 rows) - The 177 projects that were downgraded took a median 9 months to reach Amber/Red or worse — Victorian IT Project Dashboard: months between a project's first rated snapshot and the first one rating it Amber/Red or worse, over the projects rated in at least two snapshots. 1363 projects rated at least twice were never downgraded, so they are not in the median. 244 of 284 rows are rated at 2025-26 Q2. A downgrade is a move into either of the two worst levels the source publishes (Red, Amber/Red); 37 projects were already there at their first report and do not count as downgraded. All 3 agencies with at least 10 downgraded projects get their own bar; agencies under 10 downgraded projects sit in Other agencies. Each bar carries a bootstrap 95% interval. Protocol 1.0; association, not cause. Rows: https://data.tollgatehq.com/datasets/vic-itd?chart=std-time-to-first-downgrade (See the 1,735 rows) - Cost sits above baseline for 62% to 71% of projects across the four size bands — Victorian IT Project Dashboard: share of projects above baseline cost, by quartile of project size. Size is the planned cost on the project's latest row. The four quartiles hold 241, 242, 241 and 242 projects. Each bar carries a Wilson 95% interval. Protocol 1.0; association, not cause. Rows: https://data.tollgatehq.com/datasets/vic-itd?chart=std-drivers-size-band (See the 6,218 rows) - Hybrid - PRINCE2 and Agile (incl PRINCE2 Agile method) covers 54% of the 106 projects that planned to start in 2025 — Victorian IT Project Dashboard: the methodology mix of every project with a planned start date, by the year it planned to start. Each bar is a share of the cohort's projects that report a methodology, 19 to 177 projects per cohort. A cohort under 10 projects does not appear, and levels outside the five most common sit in Other. Protocol 1.0. Rows: https://data.tollgatehq.com/datasets/vic-itd?chart=std-attribute-mix-by-cohort (See the 10,938 rows) - The source restated its planned figures on 2.7% (cost) and 0.8% (end date) of the 1803 projects seen at least twice — Victorian IT Project Dashboard: projects whose published baseline differs between two of their own snapshots, over the 1803 projects seen in at least two snapshots. A source that publishes no separate baseline is left out here: comparing its first report to its latest already uses the original figure. Each bar carries a Wilson 95% interval. Protocol 1.0. Rows: https://data.tollgatehq.com/datasets/vic-itd?chart=std-rebaselining (See the 10,649 rows) - 87% of the 2070 projects seen before 2025-26 Q2 are absent from it — Victorian IT Project Dashboard: each bar holds the projects continuing from the previous snapshot and those entering at this one, so it is that snapshot's own population. Leavers are not a band on it. 30 projects left between 2025-26 Q1 and 2025-26 Q2. A leaver is not a failure: a project that finished leaves the register the same way one that stopped does, and this measure cannot tell them apart. 1091 of the 1808 leavers last carried a completion marker. Protocol 1.0. Rows: https://data.tollgatehq.com/datasets/vic-itd?chart=std-churn (See the 10,938 rows) - 34% of the 1808 projects that left the register carried no completion or termination marker — Victorian IT Project Dashboard: a leaver is a project seen in an earlier snapshot and absent from the latest one, read off its last row. A completion marker is stage reading Closed - Completed or Completed. A termination marker is stage reading Closed - Terminated, Closed - Merged or Terminated. Anything else, a blank cell included, counts as no marker. 1091 projects left with a completion marker. Each bar is a share of that agency's own leavers. 12 of 51 agencies with at least 10 leavers get their own bar: the biggest by count, plus the highest and the lowest share. The other 39 agencies and every agency under 10 leavers sit in Other agencies. Protocol 1.0. Rows: https://data.tollgatehq.com/datasets/vic-itd?chart=std-exits-by-agency (See the 9,075 rows) ### Questions - Q: What share of Victorian IT dashboard projects cost more than their baseline? A: 67% of 966 projects now cost more than their baseline figure. Victorian IT Project Dashboard: baseline and current cost taken from the same row, the project's latest snapshot; nominal, no CPI adjustment. - Q: How often does Victorian IT dashboard restate a project's plan? A: 68% of 906 projects cost more than the original plan, 68% more than the current one. Victorian IT Project Dashboard: the 906 projects seen in at least two snapshots that carry a planned cost. - Q: What share of Victorian IT dashboard projects finish later than planned? A: The source reports 87% of 1161 projects finishing late. Victorian IT Project Dashboard: calendar months between the baseline and the current completion date, both on the latest row. - Q: What share of Victorian IT dashboard projects were delivered on plan? A: 11% of 555 completed projects came in at or under plan on both cost and date. Victorian IT Project Dashboard: the projects the source marks completed that carry a baseline and a current figure for both cost and completion date. - Q: How many Victorian IT dashboard projects are rated Red? A: 9.8% of the 244 projects rated in 2025-26 Q2 were Red. Victorian IT Project Dashboard: status as the source published it at each snapshot. - Q: How long before a Victorian IT dashboard project is first downgraded? A: The 177 projects that were downgraded took a median 9 months to reach Amber/Red or worse. Victorian IT Project Dashboard: months between a project's first rated snapshot and the first one rating it Amber/Red or worse, over the projects rated in at least two snapshots. - Q: Do bigger Victorian IT dashboard projects overrun more often? A: Cost sits above baseline for 62% to 71% of projects across the four size bands. Victorian IT Project Dashboard: share of projects above baseline cost, by quartile of project size. Association, not cause. - Q: How many Victorian IT dashboard projects enter and leave each snapshot? A: 87% of the 2070 projects seen before 2025-26 Q2 are absent from it. Victorian IT Project Dashboard: each bar holds the projects continuing from the previous snapshot and those entering at this one, so it is that snapshot's own population. - Q: What share of Victorian IT dashboard projects leave without a recorded outcome? A: 34% of the 1808 projects that left the register carried no completion or termination marker. Victorian IT Project Dashboard: a leaver is a project seen in an earlier snapshot and absent from the latest one, read off its last row. ## Queensland Digital Projects Dashboard https://data.tollgatehq.com/datasets/qld-dpd · Queensland Government (per-agency contributions) · CC BY 4.0 · as at 30 Aug 2026 · 154 initiatives · 22 agencies · 1 snapshot (2026-09-02) · RAG + scope/cost/delay event flags Queensland Digital Projects Dashboard: 33% of 147 projects now cost more than their baseline figure, as at 30 Aug 2026. Cite: Queensland Government (per-agency contributions) (2026). Queensland Digital Projects Dashboard. Tollgate Data, https://data.tollgatehq.com/datasets/qld-dpd, as at 30 Aug 2026. Licence: CC BY 4.0. ### Charts - 33% of 147 projects now cost more than their baseline figure — Queensland Digital Projects Dashboard: baseline and current cost taken from the same row, the project's latest snapshot; nominal, no CPI adjustment. 147 of 154 projects can be compared. The median is +86% among the 48 projects that moved above plan, and 0% across all 147 projects that can be compared. 7 projects report a zero baseline and are left out: you cannot compute growth against zero. A zero commencement allocation here is usually a nil return: the agency lodged the row with no figure. Above plan includes deliberate re-scoping, so this is not a count of blowouts. Protocol 1.0. Rows: https://data.tollgatehq.com/datasets/qld-dpd?chart=std-cost-growth-distribution (See the 147 rows) - The source reports 80% of 96 projects finishing late — Queensland Digital Projects Dashboard: the source's own delay flag, not a date comparison: a project counts as late when the flag is set. 96 of 154 projects can be compared. No months are published, so no magnitude is computed. Protocol 1.0. Rows: https://data.tollgatehq.com/datasets/qld-dpd?chart=std-schedule-slip-distribution (See the 96 rows) - Cost sits above baseline for 19% to 37% of projects across 3 initiative stage groups — Queensland Digital Projects Dashboard: the share of projects above baseline cost, split by initiative stage. A group with fewer than 10 projects that can be compared is left out. All 3 groups that made the cut get their own bar. Each bar carries a Wilson 95% interval. Protocol 1.0; association, not cause. Rows: https://data.tollgatehq.com/datasets/qld-dpd?chart=std-drivers-initiative-stage (See the 145 rows) - 2.7% of the 147 projects rated at 2 Sep 2026 were Red — Queensland Digital Projects Dashboard: status as the source published it at each snapshot. Levels in use at 2 Sep 2026: Red, Amber, Green. 7 unrated or exempt rows sit outside the 2 Sep 2026 bar. These are the source's own words, carried through without re-grading. Protocol 1.0. Rows: https://data.tollgatehq.com/datasets/qld-dpd?chart=std-status-mix (See the 154 rows) - Cost sits above baseline for 16% to 50% of projects across the four size bands — Queensland Digital Projects Dashboard: share of projects above baseline cost, by quartile of project size. Size is the planned cost on the project's latest row. The four quartiles hold 36, 37, 37 and 37 projects. Each bar carries a Wilson 95% interval. Protocol 1.0; association, not cause. Rows: https://data.tollgatehq.com/datasets/qld-dpd?chart=std-drivers-size-band (See the 147 rows) ### Questions - Q: What share of Queensland DPD projects cost more than their baseline? A: 33% of 147 projects now cost more than their baseline figure. Queensland Digital Projects Dashboard: baseline and current cost taken from the same row, the project's latest snapshot; nominal, no CPI adjustment. - Q: What share of Queensland DPD projects finish later than planned? A: The source reports 80% of 96 projects finishing late. Queensland Digital Projects Dashboard: the source's own delay flag, not a date comparison: a project counts as late when the flag is set. - Q: How many Queensland DPD projects are rated Red? A: 2.7% of the 147 projects rated at 2 Sep 2026 were Red. Queensland Digital Projects Dashboard: status as the source published it at each snapshot. - Q: Do bigger Queensland DPD projects overrun more often? A: Cost sits above baseline for 16% to 50% of projects across the four size bands. Queensland Digital Projects Dashboard: share of projects above baseline cost, by quartile of project size. Association, not cause. ## WA OAG Status of Public Sector ICT Projects https://data.tollgatehq.com/datasets/wa-oag · Office of the Auditor General WA · All rights reserved · as at 16 Jun 2025 · 10 projects · $2.6b combined initial cost WA OAG Status of Public Sector ICT Projects: 78% of 9 projects now cost more than their baseline figure, as at 16 Jun 2025. Cite: Office of the Auditor General WA (2025). WA OAG Status of Public Sector ICT Projects. Tollgate Data, https://data.tollgatehq.com/datasets/wa-oag, as at 16 Jun 2025. Licence: All rights reserved. ### Charts - 78% of 9 projects now cost more than their baseline figure — WA OAG Status of Public Sector ICT Projects: baseline and current cost taken from the same row, the project's latest snapshot; nominal, no CPI adjustment. 9 of 10 projects can be compared. The median is +109% among the 7 projects that moved above plan, and +95% across all 9 projects that can be compared. Above plan includes deliberate re-scoping, so this is not a count of blowouts. Protocol 1.0. Rows: https://data.tollgatehq.com/datasets/wa-oag?chart=std-cost-growth-distribution (See the 9 rows) - The source reports 89% of 9 projects finishing late — WA OAG Status of Public Sector ICT Projects: calendar months between the baseline and the current completion date, both on the latest row. 9 of 10 projects can be compared. The median is 25 months among the 8 projects that slipped, and 24 months across all 9 projects that can be compared. Protocol 1.0. Rows: https://data.tollgatehq.com/datasets/wa-oag?chart=std-schedule-slip-distribution (See the 9 rows) - The 5 largest projects carry 98% of planned cost across 10 projects — WA OAG Status of Public Sector ICT Projects: $2.6b of planned cost across the 10 projects in the latest snapshot (2025) that carry a size figure. Size is the planned cost on the project's latest row, nominal, no CPI adjustment. No project is named here. Protocol 1.0. Rows: https://data.tollgatehq.com/datasets/wa-oag?chart=std-size-distribution (See the 10 rows) ### Questions - Q: What share of WA OAG ICT audit projects cost more than their baseline? A: 78% of 9 projects now cost more than their baseline figure. WA OAG Status of Public Sector ICT Projects: baseline and current cost taken from the same row, the project's latest snapshot; nominal, no CPI adjustment. - Q: What share of WA OAG ICT audit projects finish later than planned? A: The source reports 89% of 9 projects finishing late. WA OAG Status of Public Sector ICT Projects: calendar months between the baseline and the current completion date, both on the latest row. ## UK Government Major Projects Portfolio (GMPP) https://data.tollgatehq.com/datasets/uk-gmpp · IPA / NISTA (Cabinet Office) · OGL v3 · as at 31 Mar 2026 · 1,581 rows · 14 snapshots (2012 Sep → 2026 Mar) · £438b WLC latest UK Government Major Projects Portfolio (GMPP): 60% of 279 projects now cost more than their baseline figure, as at 31 Mar 2026. Cite: IPA / NISTA (Cabinet Office) (2026). UK Government Major Projects Portfolio (GMPP). Tollgate Data, https://data.tollgatehq.com/datasets/uk-gmpp, as at 31 Mar 2026. Licence: OGL v3. ### Charts - 60% of 279 projects now cost more than their baseline figure — UK Government Major Projects Portfolio (GMPP): the cost at the project's first snapshot against the cost at its latest; nominal, no CPI adjustment. 279 of 760 projects can be compared. The median is +29% among the 167 projects that moved above plan, and +4% across all 279 projects that can be compared. 11 projects report a zero baseline and are left out: you cannot compute growth against zero. Above plan includes deliberate re-scoping, so this is not a count of blowouts. Protocol 1.0. Rows: https://data.tollgatehq.com/datasets/uk-gmpp?chart=std-cost-growth-distribution (See the 827 rows) - The source reports 49% of 328 projects finishing late — UK Government Major Projects Portfolio (GMPP): calendar months between the completion date at the project's first snapshot and the date at its latest. 328 of 760 projects can be compared. The median is 20 months among the 161 projects that slipped, and 0 months across all 328 projects that can be compared. Protocol 1.0. Rows: https://data.tollgatehq.com/datasets/uk-gmpp?chart=std-schedule-slip-distribution (See the 976 rows) - Cost sits above baseline for 56% to 73% of projects across 4 category groups — UK Government Major Projects Portfolio (GMPP): the share of projects above baseline cost, split by category. A group with fewer than 10 projects that can be compared is left out. All 4 groups that made the cut get their own bar. Each bar carries a Wilson 95% interval. Protocol 1.0; association, not cause. Rows: https://data.tollgatehq.com/datasets/uk-gmpp?chart=std-drivers-category (See the 578 rows) - Cost sits above baseline for 41% to 80% of projects across 12 department groups — UK Government Major Projects Portfolio (GMPP): the share of projects above baseline cost, split by department. A group with fewer than 10 projects that can be compared is left out. 8 of the 12 groups that made the cut get their own bar: the biggest by project count, plus the highest and the lowest. Each bar carries a Wilson 95% interval. Protocol 1.0; association, not cause. Rows: https://data.tollgatehq.com/datasets/uk-gmpp?chart=std-drivers-department (See the 471 rows) - Cost sits above baseline for 33% to 69% of projects, by delivery confidence at first report — UK Government Major Projects Portfolio (GMPP): share of projects above baseline cost, by the status published at the project's first snapshot, worst to best. Taken over the 269 projects in the qualifying confidence levels (seen at least twice, with a comparable cost); levels with fewer than 10 such projects do not qualify. Each bar carries a Wilson 95% interval. Protocol 1.0; association, not cause. Rows: https://data.tollgatehq.com/datasets/uk-gmpp?chart=std-drivers-first-confidence (See the 789 rows) - 20% of the 172 projects rated in 2026 Mar were Red — UK Government Major Projects Portfolio (GMPP): status as the source published it at each snapshot. Levels in use at 2026 Mar: Red, Amber, Green. 17 unrated or exempt rows sit outside the 2026 Mar bar. These are the source's own words, carried through without re-grading. Protocol 1.0. Rows: https://data.tollgatehq.com/datasets/uk-gmpp?chart=std-status-mix (See the 1,581 rows) - Confidence moved on 47 of 149 rated projects between 2025 Mar and 2026 Mar: 30 projects improved, 17 worsened — UK Government Major Projects Portfolio (GMPP): the 149 projects carrying a rated status in both 2025 Mar and 2026 Mar. A project rated in only one of the two is not counted. Movement is read on the source's own scale, worst to best. Protocol 1.0. Rows: https://data.tollgatehq.com/datasets/uk-gmpp?chart=std-status-transitions (See the 477 rows) - The 59 projects that were downgraded took a median 24 months to reach Amber/Red or worse — UK Government Major Projects Portfolio (GMPP): months between a project's first rated snapshot and the first one rating it Amber/Red or worse, over the projects rated in at least two snapshots. 237 projects rated at least twice were never downgraded, so they are not in the median. 172 of 189 rows are rated at 2026 Mar. A downgrade is a move into either of the two worst levels the source publishes (Red, Amber/Red); 95 projects were already there at their first report and do not count as downgraded. The one agency with at least 10 downgraded projects gets its own bar; agencies under 10 downgraded projects sit in Other agencies. Each bar carries a bootstrap 95% interval. Protocol 1.0; association, not cause. Rows: https://data.tollgatehq.com/datasets/uk-gmpp?chart=std-time-to-first-downgrade (See the 234 rows) - Cost sits above baseline for 52% to 67% of projects across the four size bands — UK Government Major Projects Portfolio (GMPP): share of projects above baseline cost, by quartile of project size. Size is the source's own whole-life cost figure at the project's latest snapshot. The four quartiles hold 69, 70, 70 and 70 projects. Each bar carries a Wilson 95% interval. Protocol 1.0; association, not cause. Rows: https://data.tollgatehq.com/datasets/uk-gmpp?chart=std-drivers-size-band (See the 827 rows) - Government Transformation and Service Delivery covers 67% of the 12 projects that planned to start in 2024 — UK Government Major Projects Portfolio (GMPP): the category mix of every project with a planned start date, by the year it planned to start. Each bar is a share of the cohort's projects that report a category, 12 to 70 projects per cohort. A cohort under 10 projects does not appear, and levels outside the five most common sit in Other. Protocol 1.0. Rows: https://data.tollgatehq.com/datasets/uk-gmpp?chart=std-attribute-mix-by-cohort (See the 1,581 rows) - 78% of the 734 projects seen before 2026 Mar are absent from it — UK Government Major Projects Portfolio (GMPP): each bar holds the projects continuing from the previous snapshot and those entering at this one, so it is that snapshot's own population. Leavers are not a band on it. 51 projects left between 2025 Mar and 2026 Mar. A leaver is not a failure: a project that finished leaves the register the same way one that stopped does, and this measure cannot tell them apart. The source publishes no completion or termination marker, so every exit here is unexplained. Protocol 1.0. Rows: https://data.tollgatehq.com/datasets/uk-gmpp?chart=std-churn (See the 1,581 rows) ### Questions - Q: What does GMPP stand for? A: GMPP stands for the Government Major Projects Portfolio, the UK government's list of its largest and riskiest projects, reported each year by NISTA, formerly the Infrastructure and Projects Authority. - Q: What is a delivery confidence assessment? A: It is a rating of how likely a project is to deliver to time, cost and quality, on a fixed scale from Red to Green. The MPA assigned it first, then the IPA, and NISTA does now. - Q: How many GMPP projects are rated red? A: The delivery-confidence mix chart on this page carries the count for every year, and the latest annual report's figures sit in the chart's own title. - Q: Where does the data come from? A: From the annual GMPP data publications on gov.uk, one CSV per department per year, reused under the Open Government Licence. - Q: What share of UK GMPP projects cost more than their baseline? A: 60% of 279 projects now cost more than their baseline figure. UK Government Major Projects Portfolio (GMPP): the cost at the project's first snapshot against the cost at its latest; nominal, no CPI adjustment. - Q: What share of UK GMPP projects finish later than planned? A: The source reports 49% of 328 projects finishing late. UK Government Major Projects Portfolio (GMPP): calendar months between the completion date at the project's first snapshot and the date at its latest. - Q: How many UK GMPP projects are rated Red? A: 20% of the 172 projects rated in 2026 Mar were Red. UK Government Major Projects Portfolio (GMPP): status as the source published it at each snapshot. - Q: How long before a UK GMPP project is first downgraded? A: The 59 projects that were downgraded took a median 24 months to reach Amber/Red or worse. UK Government Major Projects Portfolio (GMPP): months between a project's first rated snapshot and the first one rating it Amber/Red or worse, over the projects rated in at least two snapshots. - Q: Do bigger UK GMPP projects overrun more often? A: Cost sits above baseline for 52% to 67% of projects across the four size bands. UK Government Major Projects Portfolio (GMPP): share of projects above baseline cost, by quartile of project size. Association, not cause. - Q: How many UK GMPP projects enter and leave each snapshot? A: 78% of the 734 projects seen before 2026 Mar are absent from it. UK Government Major Projects Portfolio (GMPP): each bar holds the projects continuing from the previous snapshot and those entering at this one, so it is that snapshot's own population. ## US Federal IT Dashboard CIO ratings https://data.tollgatehq.com/datasets/us-itdb · General Services Administration (for OMB's IT Dashboard) · US public domain · as at 7 Sep 2026 · 8,267 rows · 1,776 investments · 30 quarters (2017 Q2 → 2026 Q2) · 26 agencies US Federal IT Dashboard CIO ratings: 40% of the 366 projects rated in the 4 quarters to 30 Jun 2026 were Medium Risk or worse on the CIO rating, as at 7 Sep 2026. Cite: General Services Administration (for OMB's IT Dashboard) (2026). US Federal IT Dashboard CIO ratings. Tollgate Data, https://data.tollgatehq.com/datasets/us-itdb, as at 7 Sep 2026. Licence: US public domain. ### Charts - 40% of the 366 projects rated in the 4 quarters to 30 Jun 2026 were Medium Risk or worse on the CIO rating — US Federal IT Dashboard CIO ratings: status as the source published it at each snapshot. Levels in use at 30 Jun 2026: Moderately High Risk, Medium Risk, Moderately Low Risk, Low Risk. 0 unrated or exempt rows sit outside the 30 Jun 2026 bar. The headline counts each project's latest rating in the 4 quarters to 30 Jun 2026; the bars count ratings per quarter. These are the source's own words, carried through without re-grading. Protocol 1.0. Rows: https://data.tollgatehq.com/datasets/us-itdb?chart=std-status-mix (See the 8,267 rows) - Confidence moved on 6 of 51 rated projects between 31 Mar 2026 and 30 Jun 2026: 2 projects improved, 4 worsened — US Federal IT Dashboard CIO ratings: the 51 projects carrying a rated status in both 31 Mar 2026 and 30 Jun 2026. A project rated in only one of the two is not counted. Movement is read on the source's own scale, worst to best. Protocol 1.0. Rows: https://data.tollgatehq.com/datasets/us-itdb?chart=std-status-transitions (See the 712 rows) - The 62 projects that were downgraded took a median 19 months to reach Moderately High Risk or worse — US Federal IT Dashboard CIO ratings: months between a project's first rated snapshot and the first one rating it Moderately High Risk or worse, over the projects rated in at least two snapshots. 1340 projects rated at least twice were never downgraded, so they are not in the median. 57 of 57 rows are rated at 30 Jun 2026. A downgrade is a move into either of the two worst levels the source publishes (High Risk, Moderately High Risk); 41 projects were already there at their first report and do not count as downgraded. The one agency with at least 10 downgraded projects gets its own bar; agencies under 10 downgraded projects sit in Other agencies. Each bar carries a bootstrap 95% interval. Protocol 1.0; association, not cause. Rows: https://data.tollgatehq.com/datasets/us-itdb?chart=std-time-to-first-downgrade (See the 609 rows) ### Questions - Q: How many US IT Dashboard projects are rated Medium Risk or worse on the CIO rating? A: 40% of the 366 projects rated in the 4 quarters to 30 Jun 2026 were Medium Risk or worse on the CIO rating. US Federal IT Dashboard CIO ratings: status as the source published it at each snapshot. - Q: How long before a US IT Dashboard project is first downgraded? A: The 62 projects that were downgraded took a median 19 months to reach Moderately High Risk or worse. US Federal IT Dashboard CIO ratings: months between a project's first rated snapshot and the first one rating it Moderately High Risk or worse, over the projects rated in at least two snapshots. ## World Bank project outcome ratings (independent evaluation) https://data.tollgatehq.com/datasets/ieg-wb · Independent Evaluation Group, World Bank Group · CC BY 4.0 · as at 6 Sep 2026 · 12,593 rows · 12,592 projects · 55 evaluation years (FY1973 → FY2027) · 9 regions World Bank project outcome ratings (independent evaluation): 18% of the 1280 projects rated in the 5 evaluation years to 2027 were Moderately Unsatisfactory or worse, as at 6 Sep 2026. Cite: Independent Evaluation Group, World Bank Group (2026). World Bank project outcome ratings (independent evaluation). Tollgate Data, https://data.tollgatehq.com/datasets/ieg-wb, as at 6 Sep 2026. Licence: CC BY 4.0. ### Charts - 18% of the 1280 projects rated in the 5 evaluation years to 2027 were Moderately Unsatisfactory or worse — World Bank project outcome ratings (independent evaluation): status as the source published it at each snapshot. Levels in use at 2027: Moderately Unsatisfactory, Moderately Satisfactory, Satisfactory, Highly Satisfactory. 0 unrated or exempt rows sit outside the 2027 bar. The headline counts each project's latest rating in the 5 evaluation years to 2027; the bars count ratings per evaluation year. These are the source's own words, carried through without re-grading. Protocol 1.0. Rows: https://data.tollgatehq.com/datasets/ieg-wb?chart=std-status-mix (See the 12,593 rows) ### Questions - Q: How many World Bank IEG projects are rated Moderately Unsatisfactory or worse? A: 18% of the 1280 projects rated in the 5 evaluation years to 2027 were Moderately Unsatisfactory or worse. World Bank project outcome ratings (independent evaluation): status as the source published it at each snapshot. ## Insights Protocol 1.0: https://data.tollgatehq.com/insights - Cost above baseline for 28% to 86% of projects, depending on which source you read — Protocol 1.0; shares use a Wilson 95% CI. The sources disagree beyond sampling noise (chi² 114, df 5), so no pooled figure is published. Rows: https://data.tollgatehq.com/insights?chart=cost-prevalence-any (See the 13,364 rows) - Cost more than 10% above baseline for 19% to 78% of projects, depending on which source you read — Protocol 1.0; shares use a Wilson 95% CI. The sources disagree beyond sampling noise (chi² 47, df 5), so no pooled figure is published. Rows: https://data.tollgatehq.com/insights?chart=cost-prevalence-10 (See the 13,364 rows) - Cost growth of 12% to 109% among the projects that moved above baseline, depending on which source you read — Protocol 1.0; medians use a bootstrap 95% CI (2000 resamples, seed 0). The sources disagree beyond sampling noise (chi² 110, df 5), so no pooled figure is published. Rows: https://data.tollgatehq.com/insights?chart=cost-magnitude-movers (See the 13,364 rows) - Finishing later than planned for 39% to 89% of projects, depending on which source you read — Protocol 1.0; shares use a Wilson 95% CI. The sources disagree beyond sampling noise (chi² 276, df 5), so no pooled figure is published. Rows: https://data.tollgatehq.com/insights?chart=schedule-slip-prevalence (See the 14,228 rows) - 5 to 40 months of slip among the projects that slipped, depending on which source you read — Protocol 1.0; medians use a bootstrap 95% CI (2000 resamples, seed 0). The sources disagree beyond sampling noise (chi² 49, df 4), so no pooled figure is published. Rows: https://data.tollgatehq.com/insights?chart=schedule-slip-magnitude (See the 14,074 rows) - 11% of 555 completed projects, from one source (Victorian IT Project Dashboard) and not a sector figure — Protocol 1.0; shares use a Wilson 95% CI. Only one source reports this measure, so there is nothing to pool it against. Rows: https://data.tollgatehq.com/insights?chart=delivered-on-plan (See the 10,938 rows) ### Risk of bias - mdpr: selection A DTA policy threshold for digital investment decides which projects appear; the threshold is absent from the data.; reporting Agencies report their own figures.; rebaselining Each release carries the budget as reported. Nothing in the data tells a re-baseline from a re-scope.; span Two releases, 2025 and 2026.; attrition 38.6% - anao-mpr: selection The Defence Committee sets the threshold a project must pass to appear; that threshold is absent from the data.; reporting The ANAO audits the figures.; rebaselining The original approved budget is fixed at first approval and holds across every edition.; span 18 editions, 2007-08 to 2024-25. The series has closed.; attrition 77.9% - anao-mpr-schedule: selection The same projects as the ANAO MPR, read at the Final Operational Capability milestone.; reporting The ANAO audits the figures.; rebaselining We use the stated original date. Whether the ANAO ever restates it is unconfirmed.; span 10 editions, 2014-15 to 2024-25.; attrition 71.7% - vic-itd: selection Each agency chooses which ICT projects reach the quarterly dashboard. No audited dollar threshold applies.; reporting Agency PMOs report their own figures.; rebaselining The data does not show when a project was re-baselined.; span 40 quarterly snapshots, 2015-16 Q3 to 2025-26 Q2.; attrition 87.3% - qld-dpd: selection Each of 22 agencies lodges what it chooses and sets its own threshold; the thresholds are absent from the data.; reporting Agencies report their own figures.; rebaselining One snapshot, so re-baselining cannot be observed.; span A single pull on 2 September 2026.; attrition single snapshot - wa-oag: selection The Auditor General picked the sample of 10 major IT projects. No fixed dollar threshold applies.; reporting The WA Office of the Auditor General audits the figures.; rebaselining One figure per project, so re-baselining cannot be observed.; span The 2025 report alone.; attrition single snapshot - uk-gmpp: selection The Cabinet Office and NISTA pick the major projects on size and risk criteria that the data does not carry.; reporting Departments report their own figures. Delivery confidence was assured by the MPA (2012–2015), the IPA (2016–2024) and NISTA (2025 on).; rebaselining The source publishes no forecast whole-life cost, so cost compares first-reported with latest whole-life cost. No re-baseline is flagged.; span 14 snapshots, September 2012 to March 2026, with a gap from 2019 to 2021.; attrition 77.8% - us-itdb: selection OMB requires agencies to report their major IT investments to the Dashboard; the reporting threshold is a policy rule the feed itself does not carry.; reporting Each agency CIO rates their own investments; the rating is the CIO's judgement, not an audit.; rebaselining The feed carries no cost or schedule baseline, so a re-baseline cannot be observed here; only the rating moves.; span 2017 Q2 to 2026 Q2, 37 quarters, 30 of them with ratings.; attrition not measurable: absence from a snapshot means the source had nothing to report about that project, never that it left - ieg-wb: selection Only closed projects that IEG validates reach this file, and each appears in the financial year its evaluation was completed, so the most recent year is a part year.; reporting IEG rates the project independently of the team that delivered it.; rebaselining The file carries no cost and no planned-vs-actual dates, so a re-baseline cannot be observed here; only IEG's outcome rating is recorded.; span FY1973 to FY2027, 55 evaluation years.; attrition not measurable: absence from a snapshot means the source had nothing to report about that project, never that it left ### Benchmarks - McKinsey & Company / University of Oxford 2012: mean cost overrun 45% (n 5,400 IT projects >$15M) — https://www.mckinsey.com/capabilities/tech-and-ai/our-insights/delivering-large-scale-it-projects-on-time-on-budget-and-on-value - Flyvbjerg, Holm & Buhl 2002: share of projects over their cost baseline 90% (n 258 transport projects) — https://arxiv.org/pdf/1303.6604 - Cantarelli et al. 2017: mean cost overrun 34% (n 127 data points / 48 studies) — https://link.springer.com/article/10.1007/s11116-017-9836-5 - UK National Audit Office 2023: delivery-confidence mix green 11%, amber 72%, red 12% (n 227 projects) — https://www.nao.org.uk/reports/assurance-for-major-projects/ - PMI (Pulse of the Profession) 2025: share delivered on time, on budget and to standard 31% (n practitioner survey, respondents not stated) — https://www.pmi.org/-/media/pmi/documents/public/pdf/learning/thought-leadership/pulse/pulse_of_the_profession_2025-1.pdf - Standish Group (CHAOS Report) 2015: share delivered on time, on budget and to standard 29% (n survey) — https://cdn1-public.infotech.com/agile/CHAOSReport2015-Final.pdf - NISTA (Cabinet Office) 2026: delivery-confidence mix green 15%, amber 58%, red 18% (n 189 projects) — https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26/nista-major-projects-annual-report-2025-26 ## Combined 17683 projects harmonised across every source: https://data.tollgatehq.com/combined